Construction
CONSTRUCTION
Joint venture plans to open 12 Bay Area urgent care centers in its first phase.
ARCHITECTURE
The system contracted Trinity Health Group to renovate the 20,000-square-foot facility into a space designed to support holistic, team-based care.
INSIDE HFM
Our 2016 Hospital Construction Survey looks at the patient experience.
2016 HOSPITAL CONSTRUCTION SURVEY
Patient experience drives design and construction.
2016 HOSPITAL CONSTRUCTION SURVEY
Construction and capital data from the most current construction survey.
CONSTRUCTION
The construction and design team used an Integrated Lean Project Delivery model to optimize cost, efficiency and value.
2016 HOSPITAL CONSTRUCTION SURVEY
Building services equipment and building tech services in progress or planned.