Building Infrastructure Equipment
BIOMEDICAL
Eskenazi Health initiative will ensure those with disabilities can access all medical equipment in its facilities.
COMPLIANCE + OPERATIONS
Taking a proactive approach with a comprehensive water response plan.
COMPLIANCE + OPERATIONS
Layered approach to ensuring safety moves from design and installation to routine hazard surveillance.
BIOMEDICAL
Pre- and post-procurement activities to help optimize purchases and installation .
BIOMEDICAL
Key departments to loop into the purchasing process.
BIOMEDICAL
Planning, purchasing and installing new technology takes meticulous planning and collaboration.
COMPLIANCE+OPERATIONS
The facility engineer’s often overlooked role in ensuring patient safety.
INFRASTRUCTURE
Taking advantage of each members' expertise is vital to selecting the right systems for the project.
INFRASTRUCTURE
Integrated project delivery was vital to selecting the right HVAC system to meet the goals of this project.
ENGINEERING
Measuring the environmental quality indicators in a dynamic hospital operating room setting.